| |
|
Type |
Horizontal 3
pass design of Membrane Wall-cum-Smoke Tube Type |
| Capacity |
1000
kg / hr to 15000 kg / hr ( F & A 100° C ) |
| Working Pressure |
Std.
10.54 / 14.5 / 17.5 kg / cm² (g) & above |
| Fuel |
Coal / Bagasse / Agro Waste ( Husk ) |
| Thermal Efficiency |
70%
on NCV of fuels.
75% on NCV of fuels with Heat Recovery Units |
| Heat
Recovery Unit |
Water
Pre Heater / Air Pre Heater |
| Furnace |
External Furnace. Membrane Wall |
| |
| ABOVE BOILERS ARE MANUFACTURED AS PER UPDATED IBR REGULATIONS |
|
|
|
| Designs & specifications are subject to change due to continuous upgradation |